Appendix A -- Application guidance

This appendix is an integral part of the Standard.

AG1–AG93

[Deleted]

Hedging (paragraphs 71–102)

Hedging instruments (paragraphs 72–77)

Qualifying instruments (paragraphs 72 and 73)

AG94

The potential loss on an option that an entity writes could be significantly greater than the potential gain in value of a related hedged item. In other words, a written option is not effective in reducing the profit or loss exposure of a hedged item. Therefore, a written option does not qualify as a hedging instrument unless it is designated as an offset to a purchased option, including one that is embedded in another financial instrument (for example, a written call option used to hedge a callable liability). In contrast, a purchased option has potential gains equal to or greater than losses and therefore has the potential to reduce profit or loss exposure from changes in fair values or cash flows. Accordingly, it can qualify as a hedging instrument.

AG95

A financial asset measured at amortised cost may be designated as a hedging instrument in a hedge of foreign currency risk.

AG96

[Deleted]

AG97

An entity’s own equity instruments are not financial assets or financial liabilities of the entity and therefore cannot be designated as hedging instruments.

Hedged items (paragraphs 78–84)

Qualifying items (paragraphs 78–80)

AG98

A firm commitment to acquire a business in a business combination cannot be a hedged item, except for foreign exchange risk, because the other risks being hedged cannot be specifically identified and measured. These other risks are general business risks.

AG99

An equity method investment cannot be a hedged item in a fair value hedge because the equity method recognises in profit or loss the investor’s share of the associate’s profit or loss, rather than changes in the investment’s fair value. For a similar reason, an investment in a consolidated subsidiary cannot be a hedged item in a fair value hedge because consolidation recognises in profit or loss the subsidiary’s profit or loss, rather than changes in the investment’s fair value. A hedge of a net investment in a foreign operation is different because it is a hedge of the foreign currency exposure, not a fair value hedge of the change in the value of the investment.

AG99A

Paragraph 80 states that in consolidated financial statements the foreign currency risk of a highly probable forecast intragroup transaction may qualify as a hedged item in a cash flow hedge, provided the transaction is denominated in a currency other than the functional currency of the entity entering into that transaction and the foreign currency risk will affect consolidated profit or loss. For this purpose an entity can be a parent, subsidiary, associate, joint venture or branch. If the foreign currency risk of a forecast intragroup transaction does not affect consolidated profit or loss, the intragroup transaction cannot qualify as a hedged item. This is usually the case for royalty payments, interest payments or management charges between members of the same group unless there is a related external transaction. However, when the foreign currency risk of a forecast intragroup transaction will affect consolidated profit or loss, the intragroup transaction can qualify as a hedged item. An example is forecast sales or purchases of inventories between members of the same group if there is an onward sale of the inventory to a party external to the group. Similarly, a forecast intragroup sale of plant and equipment from the group entity that manufactured it to a group entity that will use the plant and equipment in its operations may affect consolidated profit or loss. This could occur, for example, because the plant and equipment will be depreciated by the purchasing entity and the amount initially recognised for the plant and equipment may change if the forecast intragroup transaction is denominated in a currency other than the functional currency of the purchasing entity.

AG99B

If a hedge of a forecast intragroup transaction qualifies for hedge accounting, any gain or loss that is recognised in other comprehensive income in accordance with paragraph 95(a) shall be reclassified from equity to profit or loss as a reclassification adjustment in the same period or periods during which the foreign currency risk of the hedged transaction affects consolidated profit or loss.

AG99BA

An entity can designate all changes in the cash flows or fair value of a hedged item in a hedging relationship. An entity can also designate only changes in the cash flows or fair value of a hedged item above or below a specified price or other variable (a one-sided risk). The intrinsic value of a purchased option hedging instrument (assuming that it has the same principal terms as the designated risk), but not its time value, reflects a one-sided risk in a hedged item. For example, an entity can designate the variability of future cash flow outcomes resulting from a price increase of a forecast commodity purchase. In such a situation, only cash flow losses that result from an increase in the price above the specified level are designated. The hedged risk does not include the time value of a purchased option because the time value is not a component of the forecast transaction that affects profit or loss (paragraph 86(b)).

Designation of financial items as hedged items (paragraphs 81 and 81A)

AG99C

If a portion of the cash flows of a financial asset or financial liability is designated as the hedged item, that designated portion must be less than the total cash flows of the asset or liability. For example, in the case of a liability whose effective interest rate is below LIBOR, an entity cannot designate (a) a portion of the liability equal to the principal amount plus interest at LIBOR and (b) a negative residual portion. However, the entity may designate all of the cash flows of the entire financial asset or financial liability as the hedged item and hedge them for only one particular risk (eg only for changes that are attributable to changes in LIBOR). For example, in the case of a financial liability whose effective interest rate is 100 basis points below LIBOR, an entity can designate as the hedged item the entire liability (ie principal plus interest at LIBOR minus 100 basis points) and hedge the change in the fair value or cash flows of that entire liability that is attributable to changes in LIBOR. The entity may also choose a hedge ratio of other than one to one in order to improve the effectiveness of the hedge as described in paragraph AG100.

AG99D

In addition, if a fixed rate financial instrument is hedged some time after its origination and interest rates have changed in the meantime, the entity can designate a portion equal to a benchmark rate that is higher than the contractual rate paid on the item. The entity can do so provided that the benchmark rate is less than the effective interest rate calculated on the assumption that the entity had purchased the instrument on the day it first designates the hedged item. For example, assume an entity originates a fixed rate financial asset of CU100 that has an effective interest rate of 6 per cent at a time when LIBOR is 4 per cent. It begins to hedge that asset some time later when LIBOR has increased to 8 per cent and the fair value of the asset has decreased to CU90. The entity calculates that if it had purchased the asset on the date it first designates it as the hedged item for its then fair value of CU90, the effective yield would have been 9.5 per cent. Because LIBOR is less than this effective yield, the entity can designate a LIBOR portion of 8 per cent that consists partly of the contractual interest cash flows and partly of the difference between the current fair value (ie CU90) and the amount repayable on maturity (ie CU100).

AG99E

Paragraph 81 permits an entity to designate something other than the entire fair value change or cash flow variability of a financial instrument. For example:

(a)            all of the cash flows of a financial instrument may be designated for cash flow or fair value changes attributable to some (but not all) risks; or

(b)            some (but not all) of the cash flows of a financial instrument may be designated for cash flow or fair value changes attributable to all or only some risks (ie a ‘portion’ of the cash flows of the financial instrument may be designated for changes attributable to all or only some risks).

AG99F

To be eligible for hedge accounting, the designated risks and portions must be separately identifiable components of the financial instrument, and changes in the cash flows or fair value of the entire financial instrument arising from changes in the designated risks and portions must be reliably measurable. For example:

(a)            for a fixed rate financial instrument hedged for changes in fair value attributable to changes in a risk-free or benchmark interest rate, the risk-free or benchmark rate is normally regarded as both a separately identifiable component of the financial instrument and reliably measurable.

(b)            inflation is not separately identifiable and reliably measurable and cannot be designated as a risk or a portion of a financial instrument unless the requirements in (c) are met.

(c)            a contractually specified inflation portion of the cash flows of a recognised inflation-linked bond (assuming there is no requirement to account for an embedded derivative separately) is separately identifiable and reliably measurable as long as other cash flows of the instrument are not affected by the inflation portion.

Designation of non-financial items as hedged items (paragraph 82)

AG100

Changes in the price of an ingredient or component of a non-financial asset or non-financial liability generally do not have a predictable, separately measurable effect on the price of the item that is comparable to the effect of, say, a change in market interest rates on the price of a bond. Thus, a non-financial asset or non-financial liability is a hedged item only in its entirety or for foreign exchange risk. If there is a difference between the terms of the hedging instrument and the hedged item (such as for a hedge of the forecast purchase of Brazilian coffee using a forward contract to purchase Colombian coffee on otherwise similar terms), the hedging relationship nonetheless can qualify as a hedge relationship provided all the conditions in paragraph 88 are met, including that the hedge is expected to be highly effective. For this purpose, the amount of the hedging instrument may be greater or less than that of the hedged item if this improves the effectiveness of the hedging relationship. For example, a regression analysis could be performed to establish a statistical relationship between the hedged item (eg a transaction in Brazilian coffee) and the hedging instrument (eg a transaction in Colombian coffee). If there is a valid statistical relationship between the two variables (ie between the unit prices of Brazilian coffee and Colombian coffee), the slope of the regression line can be used to establish the hedge ratio that will maximise expected effectiveness. For example, if the slope of the regression line is 1.02, a hedge ratio based on 0.98 quantities of hedged items to 1.00 quantities of the hedging instrument maximises expected effectiveness. However, the hedging relationship may result in ineffectiveness that is recognised in profit or loss during the term of the hedging relationship.

Designation of groups of items as hedged items (paragraphs 83 and 84)

AG101

A hedge of an overall net position (eg the net of all fixed rate assets and fixed rate liabilities with similar maturities), rather than of a specific hedged item, does not qualify for hedge accounting. However, almost the same effect on profit or loss of hedge accounting for this type of hedging relationship can be achieved by designating as the hedged item part of the underlying items. For example, if a bank has CU100 of assets and CU90 of liabilities with risks and terms of a similar nature and hedges the net CU10 exposure, it can designate as the hedged item CU10 of those assets. This designation can be used if such assets and liabilities are fixed rate instruments, in which case it is a fair value hedge, or if they are variable rate instruments, in which case it is a cash flow hedge. Similarly, if an entity has a firm commitment to make a purchase in a foreign currency of CU100 and a firm commitment to make a sale in the foreign currency of CU90, it can hedge the net amount of CU10 by acquiring a derivative and designating it as a hedging instrument associated with CU10 of the firm purchase commitment of CU100.

Hedge accounting (paragraphs 85–102)

AG102

An example of a fair value hedge is a hedge of exposure to changes in the fair value of a fixed rate debt instrument as a result of changes in interest rates. Such a hedge could be entered into by the issuer or by the holder.

AG103

An example of a cash flow hedge is the use of a swap to change floating rate debt to fixed rate debt (ie a hedge of a future transaction where the future cash flows being hedged are the future interest payments).

AG104

A hedge of a firm commitment (eg a hedge of the change in fuel price relating to an unrecognised contractual commitment by an electric utility to purchase fuel at a fixed price) is a hedge of an exposure to a change in fair value. Accordingly, such a hedge is a fair value hedge. However, under paragraph 87 a hedge of the foreign currency risk of a firm commitment could alternatively be accounted for as a cash flow hedge.

Assessing hedge effectiveness

AG105

A hedge is regarded as highly effective only if both of the following conditions are met:

(a)            At the inception of the hedge and in subsequent periods, the hedge is expected to be highly effective in achieving offsetting changes in fair value or cash flows attributable to the hedged risk during the period for which the hedge is designated. Such an expectation can be demonstrated in various ways, including a comparison of past changes in the fair value or cash flows of the hedged item that are attributable to the hedged risk with past changes in the fair value or cash flows of the hedging instrument, or by demonstrating a high statistical correlation between the fair value or cash flows of the hedged item and those of the hedging instrument. The entity may choose a hedge ratio of other than one to one in order to improve the effectiveness of the hedge as described in paragraph AG100.

(b)            The actual results of the hedge are within a range of 80–125 per cent. For example, if actual results are such that the loss on the hedging instrument is CU120 and the gain on the cash instrument is CU100, offset can be measured by 120/100, which is 120 per cent, or by 100/120, which is 83 per cent. In this example, assuming the hedge meets the condition in (a), the entity would conclude that the hedge has been highly effective.

AG106

Effectiveness is assessed, at a minimum, at the time an entity prepares its annual or interim financial statements.

AG107

This Standard does not specify a single method for assessing hedge effectiveness. The method an entity adopts for assessing hedge effectiveness depends on its risk management strategy. For example, if the entity’s risk management strategy is to adjust the amount of the hedging instrument periodically to reflect changes in the hedged position, the entity needs to demonstrate that the hedge is expected to be highly effective only for the period until the amount of the hedging instrument is next adjusted. In some cases, an entity adopts different methods for different types of hedges. An entity’s documentation of its hedging strategy includes its procedures for assessing effectiveness. Those procedures state whether the assessment includes all of the gain or loss on a hedging instrument or whether the instrument’s time value is excluded.

AG107A

If an entity hedges less than 100 per cent of the exposure on an item, such as 85 per cent, it shall designate the hedged item as being 85 per cent of the exposure and shall measure ineffectiveness based on the change in that designated 85 per cent exposure. However, when hedging the designated 85 per cent exposure, the entity may use a hedge ratio of other than one to one if that improves the expected effectiveness of the hedge, as explained in paragraph AG100.

AG108

If the principal terms of the hedging instrument and of the hedged asset, liability, firm commitment or highly probable forecast transaction are the same, the changes in fair value and cash flows attributable to the risk being hedged may be likely to offset each other fully, both when the hedge is entered into and afterwards. For example, an interest rate swap is likely to be an effective hedge if the notional and principal amounts, term, repricing dates, dates of interest and principal receipts and payments, and basis for measuring interest rates are the same for the hedging instrument and the hedged item. In addition, a hedge of a highly probable forecast purchase of a commodity with a forward contract is likely to be highly effective if:

(a)            the forward contract is for the purchase of the same quantity of the same commodity at the same time and location as the hedged forecast purchase;

(b)            the fair value of the forward contract at inception is zero; and

(c)            either the change in the discount or premium on the forward contract is excluded from the assessment of effectiveness and recognised in profit or loss or the change in expected cash flows on the highly probable forecast transaction is based on the forward price for the commodity.

AG109

Sometimes the hedging instrument offsets only part of the hedged risk. For example, a hedge would not be fully effective if the hedging instrument and hedged item are denominated in different currencies that do not move in tandem. Also, a hedge of interest rate risk using a derivative would not be fully effective if part of the change in the fair value of the derivative is attributable to the counterparty’s credit risk.

AG110

To qualify for hedge accounting, the hedge must relate to a specific identified and designated risk, and not merely to the entity’s general business risks, and must ultimately affect the entity’s profit or loss. A hedge of the risk of obsolescence of a physical asset or the risk of expropriation of property by a government is not eligible for hedge accounting; effectiveness cannot be measured because those risks are not measurable reliably.

AG110A

Paragraph 74(a) permits an entity to separate the intrinsic value and time value of an option contract and designate as the hedging instrument only the change in the intrinsic value of the option contract. Such a designation may result in a hedging relationship that is perfectly effective in achieving offsetting changes in cash flows attributable to a hedged one-sided risk of a forecast transaction, if the principal terms of the forecast transaction and hedging instrument are the same.

AG110B

If an entity designates a purchased option in its entirety as the hedging instrument of a one-sided risk arising from a forecast transaction, the hedging relationship will not be perfectly effective. This is because the premium paid for the option includes time value and, as stated in paragraph AG99BA, a designated one-sided risk does not include the time value of an option. Therefore, in this situation, there will be no offset between the cash flows relating to the time value of the option premium paid and the designated hedged risk.

AG111

In the case of interest rate risk, hedge effectiveness may be assessed by preparing a maturity schedule for financial assets and financial liabilities that shows the net interest rate exposure for each time period, provided that the net exposure is associated with a specific asset or liability (or a specific group of assets or liabilities or a specific portion of them) giving rise to the net exposure, and hedge effectiveness is assessed against that asset or liability.

AG112

In assessing the effectiveness of a hedge, an entity generally considers the time value of money. The fixed interest rate on a hedged item need not exactly match the fixed interest rate on a swap designated as a fair value hedge. Nor does the variable interest rate on an interest-bearing asset or liability need to be the same as the variable interest rate on a swap designated as a cash flow hedge. A swap’s fair value derives from its net settlements. The fixed and variable rates on a swap can be changed without affecting the net settlement if both are changed by the same amount.

AG113

If an entity does not meet hedge effectiveness criteria, the entity discontinues hedge accounting from the last date on which compliance with hedge effectiveness was demonstrated. However, if the entity identifies the event or change in circumstances that caused the hedging relationship to fail the effectiveness criteria, and demonstrates that the hedge was effective before the event or change in circumstances occurred, the entity discontinues hedge accounting from the date of the event or change in circumstances.

AG113A

For the avoidance of doubt, the effects of replacing the original counterparty with a clearing counterparty and making the associated changes as described in paragraphs 91(a)(ii) and 101(a)(ii) shall be reflected in the measurement of the hedging instrument and therefore in the assessment of hedge effectiveness and the measurement of hedge effectiveness.

Fair value hedge accounting for a portfolio hedge of interest rate risk

AG114

For a fair value hedge of interest rate risk associated with a portfolio of financial assets or financial liabilities, an entity would meet the requirements of this Standard if it complies with the procedures set out in (a)–(i) and paragraphs AG115–AG132 below.

(a)            As part of its risk management process the entity identifies a portfolio of items whose interest rate risk it wishes to hedge. The portfolio may comprise only assets, only liabilities or both assets and liabilities. The entity may identify two or more portfolios, in which case it applies the guidance below to each portfolio separately.

(b)            The entity analyses the portfolio into repricing time periods based on expected, rather than contractual, repricing dates. The analysis into repricing time periods may be performed in various ways including scheduling cash flows into the periods in which they are expected to occur, or scheduling notional principal amounts into all periods until repricing is expected to occur.

(c)            On the basis of this analysis, the entity decides the amount it wishes to hedge. The entity designates as the hedged item an amount of assets or liabilities (but not a net amount) from the identified portfolio equal to the amount it wishes to designate as being hedged. This amount also determines the percentage measure that is used for testing effectiveness in accordance with paragraph AG126(b).

(d)            The entity designates the interest rate risk it is hedging. This risk could be a portion of the interest rate risk in each of the items in the hedged position, such as a benchmark interest rate (eg LIBOR).

(e)            The entity designates one or more hedging instruments for each repricing time period.

(f)            Using the designations made in (c)–(e) above, the entity assesses at inception and in subsequent periods, whether the hedge is expected to be highly effective during the period for which the hedge is designated.

(g)            Periodically, the entity measures the change in the fair value of the hedged item (as designated in (c)) that is attributable to the hedged risk (as designated in (d)), on the basis of the expected repricing dates determined in (b). Provided that the hedge is determined actually to have been highly effective when assessed using the entity’s documented method of assessing effectiveness, the entity recognises the change in fair value of the hedged item as a gain or loss in profit or loss and in one of two line items in the statement of financial position as described in paragraph 89A. The change in fair value need not be allocated to individual assets or liabilities.

(h)            The entity measures the change in fair value of the hedging instrument(s) (as designated in (e)) and recognises it as a gain or loss in profit or loss. The fair value of the hedging instrument(s) is recognised as an asset or liability in the statement of financial position.

(j)            Any ineffectiveness[2] will be recognised in profit or loss as the difference between the change in fair value referred to in (g) and that referred to in (h).

2

The same materiality considerations apply in this context as apply throughout Australian Accounting Standards.

AG115

This approach is described in more detail below. The approach shall be applied only to a fair value hedge of the interest rate risk associated with a portfolio of financial assets or financial liabilities.

AG116

The portfolio identified in paragraph AG114(a) could contain assets and liabilities. Alternatively, it could be a portfolio containing only assets, or only liabilities. The portfolio is used to determine the amount of the assets or liabilities the entity wishes to hedge. However, the portfolio is not itself designated as the hedged item.

AG117

In applying paragraph AG114(b), the entity determines the expected repricing date of an item as the earlier of the dates when that item is expected to mature or to reprice to market rates. The expected repricing dates are estimated at the inception of the hedge and throughout the term of the hedge, based on historical experience and other available information, including information and expectations regarding prepayment rates, interest rates and the interaction between them. Entities that have no entity-specific experience or insufficient experience use peer group experience for comparable financial instruments. These estimates are reviewed periodically and updated in the light of experience. In the case of a fixed rate item that is prepayable, the expected repricing date is the date on which the item is expected to prepay unless it reprices to market rates on an earlier date. For a group of similar items, the analysis into time periods based on expected repricing dates may take the form of allocating a percentage of the group, rather than individual items, to each time period. An entity may apply other methodologies for such allocation purposes. For example, it may use a prepayment rate multiplier for allocating amortising loans to time periods based on expected repricing dates. However, the methodology for such an allocation shall be in accordance with the entity’s risk management procedures and objectives.

AG118

As an example of the designation set out in paragraph AG114(c), if in a particular repricing time period an entity estimates that it has fixed rate assets of CU100 and fixed rate liabilities of CU80 and decides to hedge all of the net position of CU20, it designates as the hedged item assets in the amount of CU20 (a portion of the assets).[3] The designation is expressed as an ‘amount of a currency’ (eg an amount of dollars, euro, pounds or rand) rather than as individual assets. It follows that all of the assets (or liabilities) from which the hedged amount is drawn—ie all of the CU100 of assets in the above example—must be:

(a)            items whose fair value changes in response to changes in the interest rate being hedged; and

(b)            items that could have qualified for fair value hedge accounting if they had been designated as hedged individually. In particular, because AASB 13 specifies that the fair value of a financial liability with a demand feature (such as demand deposits and some types of time deposits) is not less than the amount payable on demand, discounted from the first date that the amount could be required to be paid, such an item cannot qualify for fair value hedge accounting for any time period beyond the shortest period in which the holder can demand payment. In the above example, the hedged position is an amount of assets. Hence, such liabilities are not a part of the designated hedged item, but are used by the entity to determine the amount of the asset that is designated as being hedged. If the position the entity wished to hedge was an amount of liabilities, the amount representing the designated hedged item must be drawn from fixed rate liabilities other than liabilities that the entity can be required to repay in an earlier time period, and the percentage measure used for assessing hedge effectiveness in accordance with paragraph AG126(b) would be calculated as a percentage of these other liabilities. For example, assume that an entity estimates that in a particular repricing time period it has fixed rate liabilities of CU100, comprising CU40 of demand deposits and CU60 of liabilities with no demand feature, and CU70 of fixed rate assets. If the entity decides to hedge all of the net position of CU30, it designates as the hedged item liabilities of CU30 or 50 per cent of the liabilities[4] with no demand feature.

3

The Standard permits an entity to designate any amount of the available qualifying assets or liabilities, ie in this example any amount of assets between CU0 and CU100.

4

CU30 ÷ (CU100 – CU40) = 50 per cent

AG119

The entity also complies with the other designation and documentation requirements set out in paragraph 88(a). For a portfolio hedge of interest rate risk, this designation and documentation specifies the entity’s policy for all of the variables that are used to identify the amount that is hedged and how effectiveness is measured, including the following:

(a)            which assets and liabilities are to be included in the portfolio hedge and the basis to be used for removing them from the portfolio.

(b)            how the entity estimates repricing dates, including what interest rate assumptions underlie estimates of prepayment rates and the basis for changing those estimates. The same method is used for both the initial estimates made at the time an asset or liability is included in the hedged portfolio and for any later revisions to those estimates.

(c)            the number and duration of repricing time periods.

(d)            how often the entity will test effectiveness and which of the two methods in paragraph AG126 it will use.

(e)            the methodology used by the entity to determine the amount of assets or liabilities that are designated as the hedged item and, accordingly, the percentage measure used when the entity tests effectiveness using the method described in paragraph AG126(b).

(f)            when the entity tests effectiveness using the method described in paragraph AG126(b), whether the entity will test effectiveness for each repricing time period individually, for all time periods in aggregate, or by using some combination of the two.

The policies specified in designating and documenting the hedging relationship shall be in accordance with the entity’s risk management procedures and objectives. Changes in policies shall not be made arbitrarily. They shall be justified on the basis of changes in market conditions and other factors and be founded on and consistent with the entity’s risk management procedures and objectives.

AG120

The hedging instrument referred to in paragraph AG114(e) may be a single derivative or a portfolio of derivatives all of which contain exposure to the hedged interest rate risk designated in paragraph AG114(d) (eg a portfolio of interest rate swaps all of which contain exposure to LIBOR). Such a portfolio of derivatives may contain offsetting risk positions. However, it may not include written options or net written options, because the Standard[5] does not permit such options to be designated as hedging instruments (except when a written option is designated as an offset to a purchased option). If the hedging instrument hedges the amount designated in paragraph AG114(c) for more than one repricing time period, it is allocated to all of the time periods that it hedges. However, the whole of the hedging instrument must be allocated to those repricing time periods because the Standard[6] does not permit a hedging relationship to be designated for only a portion of the time period during which a hedging instrument remains outstanding.

5

see paragraphs 77 and AG94

6

see paragraph 75

AG121

When the entity measures the change in the fair value of a prepayable item in accordance with paragraph AG114(g), a change in interest rates affects the fair value of the prepayable item in two ways: it affects the fair value of the contractual cash flows and the fair value of the prepayment option that is contained in a prepayable item. Paragraph 81 of the Standard permits an entity to designate a portion of a financial asset or financial liability, sharing a common risk exposure, as the hedged item, provided effectiveness can be measured. For prepayable items, paragraph 81A permits this to be achieved by designating the hedged item in terms of the change in the fair value that is attributable to changes in the designated interest rate on the basis of expected, rather than contractual, repricing dates. However, the effect that changes in the hedged interest rate have on those expected repricing dates shall be included when determining the change in the fair value of the hedged item. Consequently, if the expected repricing dates are revised (eg to reflect a change in expected prepayments), or if actual repricing dates differ from those expected, ineffectiveness will arise as described in paragraph AG126. Conversely, changes in expected repricing dates that (a) clearly arise from factors other than changes in the hedged interest rate, (b) are uncorrelated with changes in the hedged interest rate and (c) can be reliably separated from changes that are attributable to the hedged interest rate (eg changes in prepayment rates clearly arising from a change in demographic factors or tax regulations rather than changes in interest rate) are excluded when determining the change in the fair value of the hedged item, because they are not attributable to the hedged risk. If there is uncertainty about the factor that gave rise to the change in expected repricing dates or the entity is not able to separate reliably the changes that arise from the hedged interest rate from those that arise from other factors, the change is assumed to arise from changes in the hedged interest rate.

AG122

The Standard does not specify the techniques used to determine the amount referred to in paragraph AG114(g), namely the change in the fair value of the hedged item that is attributable to the hedged risk. If statistical or other estimation techniques are used for such measurement, management must expect the result to approximate closely that which would have been obtained from measurement of all the individual assets or liabilities that constitute the hedged item. It is not appropriate to assume that changes in the fair value of the hedged item equal changes in the value of the hedging instrument.

AG123

Paragraph 89A requires that if the hedged item for a particular repricing time period is an asset, the change in its value is presented in a separate line item within assets. Conversely, if the hedged item for a particular repricing time period is a liability, the change in its value is presented in a separate line item within liabilities. These are the separate line items referred to in paragraph AG114(g). Specific allocation to individual assets (or liabilities) is not required.

AG124

Paragraph AG114(i) notes that ineffectiveness arises to the extent that the change in the fair value of the hedged item that is attributable to the hedged risk differs from the change in the fair value of the hedging derivative. Such a difference may arise for a number of reasons, including:

(a)            actual repricing dates being different from those expected, or expected repricing dates being revised;

(b)            items in the hedged portfolio becoming impaired or being derecognised;

(c)            the payment dates of the hedging instrument and the hedged item being different; and

(d)            other causes (eg when a few of the hedged items bear interest at a rate below the benchmark rate for which they are designated as being hedged, and the resulting ineffectiveness is not so great that the portfolio as a whole fails to qualify for hedge accounting).

Such ineffectiveness[7] shall be identified and recognised in profit or loss.

7

The same materiality considerations apply in this context as apply throughout Australian Accounting Standards.

AG125

Generally, the effectiveness of the hedge will be improved:

(a)            if the entity schedules items with different prepayment characteristics in a way that takes account of the differences in prepayment behaviour.

(b)            when the number of items in the portfolio is larger. When only a few items are contained in the portfolio, relatively high ineffectiveness is likely if one of the items prepays earlier or later than expected. Conversely, when the portfolio contains many items, the prepayment behaviour can be predicted more accurately.

(c)            when the repricing time periods used are narrower (eg 1-month as opposed to 3-month repricing time periods). Narrower repricing time periods reduce the effect of any mismatch between the repricing and payment dates (within the repricing time period) of the hedged item and those of the hedging instrument.

(d)            the greater the frequency with which the amount of the hedging instrument is adjusted to reflect changes in the hedged item (eg because of changes in prepayment expectations).

AG126

An entity tests effectiveness periodically. If estimates of repricing dates change between one date on which an entity assesses effectiveness and the next, it shall calculate the amount of effectiveness either:

(a)            as the difference between the change in the fair value of the hedging instrument (see paragraph AG114(h)) and the change in the value of the entire hedged item that is attributable to changes in the hedged interest rate (including the effect that changes in the hedged interest rate have on the fair value of any embedded prepayment option); or

(b)            using the following approximation. The entity:

(i)             calculates the percentage of the assets (or liabilities) in each repricing time period that was hedged, on the basis of the estimated repricing dates at the last date it tested effectiveness.

(ii)            applies this percentage to its revised estimate of the amount in that repricing time period to calculate the amount of the hedged item based on its revised estimate.

(iii)           calculates the change in the fair value of its revised estimate of the hedged item that is attributable to the hedged risk and presents it as set out in paragraph AG114(g).

(iv)           recognises ineffectiveness equal to the difference between the amount determined in (iii) and the change in the fair value of the hedging instrument (see paragraph AG114(h)).

AG127

When measuring effectiveness, the entity distinguishes revisions to the estimated repricing dates of existing assets (or liabilities) from the origination of new assets (or liabilities), with only the former giving rise to ineffectiveness. All revisions to estimated repricing dates (other than those excluded in accordance with paragraph AG121), including any reallocation of existing items between time periods, are included when revising the estimated amount in a time period in accordance with paragraph AG126(b)(ii) and hence when measuring effectiveness. Once ineffectiveness has been recognised as set out above, the entity establishes a new estimate of the total assets (or liabilities) in each repricing time period, including new assets (or liabilities) that have been originated since it last tested effectiveness, and designates a new amount as the hedged item and a new percentage as the hedged percentage. The procedures set out in paragraph AG126(b) are then repeated at the next date it tests effectiveness.

AG128

Items that were originally scheduled into a repricing time period may be derecognised because of earlier than expected prepayment or write-offs caused by impairment or sale. When this occurs, the amount of change in fair value included in the separate line item referred to in paragraph AG114(g) that relates to the derecognised item shall be removed from the statement of financial position, and included in the gain or loss that arises on derecognition of the item. For this purpose, it is necessary to know the repricing time period(s) into which the derecognised item was scheduled, because this determines the repricing time period(s) from which to remove it and hence the amount to remove from the separate line item referred to in paragraph AG114(g). When an item is derecognised, if it can be determined in which time period it was included, it is removed from that time period. If not, it is removed from the earliest time period if the derecognition resulted from higher than expected prepayments, or allocated to all time periods containing the derecognised item on a systematic and rational basis if the item was sold or became impaired.

AG129

In addition, any amount relating to a particular time period that has not been derecognised when the time period expires is recognised in profit or loss at that time (see paragraph 89A). For example, assume an entity schedules items into three repricing time periods. At the previous redesignation, the change in fair value reported in the single line item in the statement of financial position was an asset of CU25. That amount represents amounts attributable to periods 1, 2 and 3 of CU7, CU8 and CU10, respectively. At the next redesignation, the assets attributable to period 1 have been either realised or rescheduled into other periods. Therefore, CU7 is derecognised from the statement of financial position and recognised in profit or loss. CU8 and CU10 are now attributable to periods 1 and 2, respectively. These remaining periods are then adjusted, as necessary, for changes in fair value as described in paragraph AG114(g).

AG130

As an illustration of the requirements of the previous two paragraphs, assume that an entity scheduled assets by allocating a percentage of the portfolio into each repricing time period. Assume also that it scheduled CU100 into each of the first two time periods. When the first repricing time period expires, CU110 of assets are derecognised because of expected and unexpected repayments. In this case, all of the amount contained in the separate line item referred to in paragraph AG114(g) that relates to the first time period is removed from the statement of financial position, plus 10 per cent of the amount that relates to the second time period.

AG131

If the hedged amount for a repricing time period is reduced without the related assets (or liabilities) being derecognised, the amount included in the separate line item referred to in paragraph AG114(g) that relates to the reduction shall be amortised in accordance with paragraph 92.

AG132

An entity may wish to apply the approach set out in paragraphs AG114–AG131 to a portfolio hedge that had previously been accounted for as a cash flow hedge in accordance with AASB 139. Such an entity would revoke the previous designation of a cash flow hedge in accordance with paragraph 101(d), and apply the requirements set out in that paragraph. It would also redesignate the hedge as a fair value hedge and apply the approach set out in paragraphs AG114–AG131 prospectively to subsequent accounting periods.

Transition (paragraphs 103–108C)

AG133

An entity may have designated a forecast intragroup transaction as a hedged item at the start of an annual period beginning on or after 1 January 2005 (or, for the purpose of restating comparative information, the start of an earlier comparative period) in a hedge that would qualify for hedge accounting in accordance with this Standard (as amended by the last sentence of paragraph 80). Such an entity may use that designation to apply hedge accounting in consolidated financial statements from the start of the annual period beginning on or after 1 January 2005 (or the start of the earlier comparative period). Such an entity shall also apply paragraphs AG99A and AG99B from the start of the annual period beginning on or after 1 January 2005. However, in accordance with paragraph 108B, it need not apply paragraph AG99B to comparative information for earlier periods.