Background

1

In surface mining operations, entities may find it necessary to remove mine waste materials (‘overburden’) to gain access to mineral ore deposits. This waste removal activity is known as ‘stripping’.

2

During the development phase of the mine (before production begins), stripping costs are usually capitalised as part of the depreciable cost of building, developing and constructing the mine. Those capitalised costs are depreciated or amortised on a systematic basis, usually by using the units of production method, once production begins.

3

A mining entity may continue to remove overburden and to incur stripping costs during the production phase of the mine.

4

The material removed when stripping in the production phase will not necessarily be 100 per cent waste; often it will be a combination of ore and waste. The ratio of ore to waste can range from uneconomic low grade to profitable high grade. Removal of material with a low ratio of ore to waste may produce some usable material, which can be used to produce inventory. This removal might also provide access to deeper levels of material that have a higher ratio of ore to waste. There can therefore be two benefits accruing to the entity from the stripping activity: usable ore that can be used to produce inventory and improved access to further quantities of material that will be mined in future periods.

5

This Interpretation considers when and how to account separately for these two benefits arising from the stripping activity, as well as how to measure these benefits both initially and subsequently.